UFV
Photovoltaic Plants
EPC PV + EPC HV (Elevator Substation + Transmission Line + Connection Bay) Provision of project management, engineering, electrical panels, equipment, materials, civil construction, electromechanical installation, commissioning and start-up services required for the construction of the Photovoltaic Plant Sertão Solar Barreiras 117MWp (300ha) and 34.5/69kV elevator substation with 100MVA of power, 17km of Transmission Line and Grid Connection Bay.
Barreiras - Bahia - Brazil
Client: Atlas Renewable Energy
Implementation: 2019
UFV SÃO PEDRO
UFV TALENTO